Flukso card V2.1 in Dragino
by
onI have Flukso card V 2.1 in a Dragino , and a current clamp, I have trouble reading the measurements, i do not how to obtain them from Dragino, I would like to know how to obtain these measurements, help me please!
I have Flukso card V 2.1 in a Dragino , and a current clamp, I have trouble reading the measurements, i do not how to obtain them from Dragino, I would like to know how to obtain these measurements, help me please!
Hi
Selling my original v1.1 single phase Flukso, leftover after an upgrade to a v1.2. Its the 240v version bought from the Rowetel shop. Included are.
- Flukso
- Clamp
- LAN patch lead
- Antenna
- Power Supply (European plug)
Prefer an Australian buyer, please email me your offer.
Thanks!
I have just connected my FLM02A to a 3 phase switchboard. I selected the 3 phase option and have used the 3 clamp configuration (one clamp per phase connected to ports 1, 2 & 3), which are separate to my PV input. Is there a way I can also graph my PV on to the dash.
Is it as simple as purchasing a 4th clamp and connecting it to port 4? I do not have much knowledge in this area and do not understand the difference between analog, pulse etc.
Hi!
thanks to jcnissen I now have a Flukso V1!
version 101
I installed it, managed to connect to the interface, and configure both the network adapters.
the device gets the right utc time from the ntp and talks with flukso website.
I attached the clamps to my cables, I have a single phase line, so I attached a clamp to one cale of the main line and the second clamp to a particular section of the utilities of the house (fridge + washer).
1) I attached the clamps to only 1 cable (the main line is composed of 2 cables (plus ground), i clamped one of the two), is it right?
I like the new graphs, well done:)
I changed my solar measuring from CC to digital at the end of January 12 (26th) so the Cumulative graphs is now incorrect as it shows usage from before that date but solar input from then.
This has the ratio between the 2 graphs incorrect.
Any chance of resetting my data to start from that date but archiving the prior usage data?
Thanks Bazzle